Our Progress
Since the program’s inception in 2013, we have made significant progress in repairing our aging infrastructure to keep rainwater out of the sewer system and the impact is being noticed.
500+
Public Sewer Defects Repaired
As a result of annual inspections, testing, and findings among the manholes and sewer lines underneath our city.
1800+
Private Sewer Defects Repaired
Including downspouts and sump pumps that were previously connected to the sewers, to as small as uncapped sewer cleanouts being properly covered.